KOMEG Technology Ind Co., Limited

KOMEG Technology Ind Co., Limited Top Brand Climatic Test Chamber Since 1990

Manufacturer from China
Active Member
11 Years
Home / Products / ESS Chamber /

Rapid-rate Temp Change Test Chamber (Environmental Stress Screening)ESS Chamber

Contact Now
KOMEG Technology Ind Co., Limited
City:dongguan
Province/State:guangdong
Country/Region:china
Contact Person:MsKOMEG
Contact Now

Rapid-rate Temp Change Test Chamber (Environmental Stress Screening)ESS Chamber

Ask Latest Price
Brand Name :komeg
Model Number :ESS-800S-SC20
Certification :CE
Place of Origin :China
MOQ :1 pcs
Price :Negotiation
Payment Terms :L/C, T/T, Western Union
Supply Ability :100pcs /day
Delivery Time :30 day after confirm the order
Packaging Details :rigid poly foam and wooden box
power :AC 380±10% 50Hz ,3 phase 4 wires +Ground Wires
temperature Range :-70℃~+150℃
Humidity Constancy :+-0.5ºC
Cooling Mode :Water Cooled
Exterior Material :Baked painting steel
Insulation Material :Rigid ploy foam and Glass Wool
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description


Rapid Temperature Change Environmental Cycling Test Chamber 100mm Cable Port

OEM are welcome , more detail information ,pls kindly contact :anna@komegtech.com Wechat&Whatsapp :+86-18098281986


Applications :

Applicable to environmental adaptability and reliability test in such industrial units as electronics, electrical

appliance, battery, plastics, food, paper product, vehicle, metal, chemistry, building material, research

institution, inspection and quarantine bureau, university etc..

Ⅳ.Main Technical parameters

1. Chamber (Water cooled ,ambient temperature +25℃,no load )

1.1 Workspace volume

W1000 × D800 × H 1000 mm

1.2 Exterior size

W 1600 × H 2330 × D 3195 mm (Approx )

2. Temperature

2.1 Temperature range

-70℃~+150℃

2.2 Temp Deviation

≦±2.0℃

2.3 Temp Stability

±0.5°C

2.4 Temp Uniformity

≤±2.0°C

2.5THeating up time

From -40⁰C to up to +85⁰C, linear 20⁰C/min (Dead load 30Kg iron)

2.6 Cooling time

From +85⁰C to up to -40⁰C, linear 20⁰C/min (Dead load 30Kg) iron without heating

2.7 Temp Control ramp

From 20°C to 85°C (20°C/min) +85°C dwell for 23 minutes,
From 85°C to -40°C (20°C/min)-40°C dwell for 23 minutes
From -40°C to 20°C (20°C/min) in 3 minute ramp

*Temperature performance test is based on the relevant provisions of IEC60068 -3 standard

measurement; sensor placed in the unit outlet

Ⅴ,Chamber Structure

Overall structure and chamber was composed of three parts as below.

Insulation box, separate refrigeration units, and electrical control cabinet.

1.Insulation box

wall material: high-quality carbon steel with static color spray

inner wall material: SUS304 # matte stainless steel plate

Insulation materials: rigid polyurethane foam insulation layer + glass fiber.

2.Door

Single door ,left open ,Heating wire was installed at the door frames to

prevent condensation at low temperatures.

3Observation window

With observation window(specific size according to design) multi-hollow

electric insulation coated glass prevent condensation effectively

4.Cable port

Φ100 mm located on right sides with rubber stopper and plastic cover

5.Lighting device

LED One type located on observation window

6. Heater

High quality nickel-chromium wire electric heater, non contact control (SSR)

7.Condensate drain outlet

With workroom condensate and condensate drain

8.Shelf for samples

stainless steel sample holder 2pcs,Adjustable, load capacity 30kg/ layer

9.Mobile Casters

Mobile Casters *4 with foot cups

10.Electric control box

Total power circuit breaker, over-temperature protection.

Ⅵ,Freezing system

1. Compressor

Bock /Bizer Semi-Hermetic Compressor from Germany

2. Refrigerant

Environmental-friendly refrigerant: R404A ,R23

3. Condenser

Shell and Tube condenser(Water -cooled)

4. Evaporator

Fin-type multi-stage automatic load capacity adjustment, No frost in long-

term use of low temperature and humidity conditions

5. Other accessories

Use internationally-known brand, such as high precise expansion valve,

oil extractor, dryer and many other accessories.

6.Refrigerant flow control

Adjust energy consumption output and control automatically to the

refrigeration system.

7.Refrigerant flow control

Adjust energy consumption output and control automatically to the

refrigeration system.

. Electrical control system

1. Control cabinet

A. Emergency stop switch
B. Power switch
C. Over-temperature protection
D.RS-485 interface

3. Protection System

A. Heater protection switch if no water
B.Heater over-current circuit breaker
C.Circulating fan over-current overload protection
D. Compressor high voltage protection switch
E. Compressor overheat protection switch
F. Compressor over-current protection switch
G. Over-voltage under-phase protection switch
H. Circuit Breakers
I. Leakage switch
J.Zero-crossing gate fluid power controller

5. Alarm Equipment stops running and sends audible alarm when the above protection appears, meanwhile, fault, causes and solutions will be displayed on the screen.
Photos show
Rapid-rate Temp Change Test Chamber (Environmental Stress Screening)ESS Chamber


Packing Details:
We use PP Film wrapping the test chamber to protect the test chamber from moisture or being scratched first, then use strong plywood case for easyload and transport, and to keep the chambers from potential crash or impact.

Photos Show

Rapid-rate Temp Change Test Chamber (Environmental Stress Screening)ESS Chamber

Rapid-rate Temp Change Test Chamber (Environmental Stress Screening)ESS Chamber

Inquiry Cart 0